Donate using PayPal

Recent photos and other lists

The 36 newest photos

Cycleway on former mineral tramway - meeting NCN route 3 in the middle distance

Muddy byway

Byway (swinging to the left) - not a particularly useful short-cut.

Cornwall's first mass vaccination centre for Covid-19 is in the middle of nowhere (Stithians Fairground) so cars are pretty much vital.

The sign shown in #105228 has been replaced but is just as vague - keep left for all those destinations (but right for the pub).

Additional cycle parking at Trumpington Road park ā€™nā€™ ride during lockdown.

Sunshine on the cycle route at Newham

Cycling in the National Trust's Tremayne estate

It's mid-lockdown, but there are lots of bikes at Paddington station (mine included). There's a public tool stand as well.

Modal filter on Quietway 2

Left turn on Quietway 2

I'm pretty sure a northbound lane has been closed off here - it's a shame that contraflow cycling wasn't maintained.

Cycle lane and contraflow on Quietway 2

West end of contraflow cycle lane on Quietway 2

Pothole on Quietway 2

Is this a replacement for the stands in #164638 and #164639, removed perhaps to give pedestrians space for social distancing ? Not very impressive.

Cycle stands to be removed - perhaps to give pedestrians space for social distancing

Cycle stands to be removed - perhaps to give pedestrians space for social distancing

Lane for taxis turning left into Paddington station - cyclists can continue ahead, but need to look out for taxis emerging.

This looked like a way for cyclists to bypass the roundabout - but no.

[Photo taken mid-May 2019] York Cycle Campaign [yorkcyclecampaign.bike] members leafletted and spoke to people on Terry Avenue and at the Butcher Terrace end of the Millennium Bridge. The message was, Terry Ave could close for flood defence ... [more]

I approve of this message šŸ¤£ https://t.co/TYjSUrvEoS

Modal filter.

Free left turn for cyclists into a contra-flow.

Two out of three lanes removed from the side road as part of 20mph programme. This has created a much safer junction for pedestrians and cyclists at a well known pinch point. Wands could then be carried further over the junction.

Two Cyclists Dismount signs connected by an awkward barrier.

Poor road junction installed 2020 introduces new road danger for cyclists.

Signs for both segregated and unsegregated shared use; they can't both be correct!

cycleway degenerates into a shared use pavement once you are over the bridge.

Access controls installed summer 2020, possibly to deter the local motorbiker which uses the cut through. The motorbiker is now observed going up the bank at the side.

Cycleway over the recently reopened Silver Jubilee Bridge between Runcorn and Widnes.

St John's Place modal filter from 1985. Station Parade was a rat run before these bollards went in.

Carrageway reallocated to create a cycleway across the bridge, while pedestrians use the old narrow footway. I'm not sure what the "End of Route" sign is about.

I think this means they want us to ride on the pavement.

The Bridge has finally reopened. After a gap of over three years you can now legally ride from Runcorn to Widnes - and bicycles don't have to pay the toll.

[Image taken 28.2.21] Clifford's Tower, York [https://www.english-heritage.org.uk/visit/places/cliffords-tower-york/]. Hoardings can contribute to a location. See also: #164609, #

^ Return to top

The 12 most recently modified photos

[Image is of the document AOD_20_00269-PEDESTRIAN_AND_CYCLIST_DIVERSION-2330317 published on the York planning site on 03 Feb 2021]. It shows the signs required to enable people to find and follow the proposed - not yet agreed (19.2.21) alt ... [more]

[Image taken 18.2.21] Terry Avenue, York. Half-term, during lockdown. A family takes a break while cycling along the motor traffic- (and therefore also noise- and air pollution-) free riverside. They were unaware the route will close to peo ... [more]

NCN562 crosses the extremely busy exit ramp from the Queensway Bridge with no protection whatsoever. UPDATE 2021: The road has now been reconfigured as a standard two lane bi-directional road subject to a 30mph speed limit with the vast ... [more]

TWO years on and there is still no way to cycle from Runcorn to Widnes during weekdays.Work has overrun on the old bridge and cycling is prohibited on the new one - #103166 Update 2021: the bridge has finally reopened #164613 so you can ... [more]

[Image taken 28.2.21] Clifford's Tower, York. Hoardings keep people off the mound but provide visual and intellectual interest and information about the project. https://www.english-heritage.org.uk/visit/places/cliffords-tower-york/clifford ... [more]

Wheel benders at St Philip Howard Catholic Church.

Wheel benders at St Philip Howard Catholic Church.

Rounded A racks

@A428Cat 9 months on and @HighwaysEAST have still failed to commission the NMU' lights at #BramptonHut Meanwhile lives are put at risk daily as vulnerable road users attempt to cross the A14 and still no date for fixing them. @camcycle @Ran ... [more]

[Image taken 18.2.21] York: First of a blizzard of signs aimed at road users on Wigginton Road ahead of works at the junction with Crichton Avenue. The road is uphill, the carriageway in each direction is very narrow. It is used by large ve ... [more]

Cycle route through Addison Howard park in Bedford.

Cycleway in Kempston, Bedford.

^ Return to top

Recent placeholders

^ Return to top

  • Icon 164656 Safer and bigger cycle lanes. White lines need repainting ASAP.
  • Icon 164654 The old railway line should be used for a walking and cycleway between Buntingford, Braughing, Puckeridge and Standon and eventually to Ware
  • Icon 164653 Slow down traffic past school ā€“ 20 mph ā€“ www.20splentyorg
  • Icon 164652 Slow down traffic past school ā€“ 20 mph ā€“ www.20splentyorg
  • Icon 164651 Slow down traffic past school ā€“ 20 mph ā€“ www.20splentyorg
  • Icon 164650 Slow down traffic past school ā€“ 20 mph ā€“ www.20splentyorg
  • Icon 164635 Really dangerous cycling East on Bridge Road East and Heronswood Road
  • Icon 164632 There is a footpath joining the cycle network here... but the foot path along the A602 is on the other side of the bushes... consequently pedestrians are using the cycle path here because there is no where else to go... path here is also very narrow and could do with the bushes cut back to make room.
  • Icon 164631 The signs here clearly indicate this is shared use. Umm.... however at the end of the ramp there are no further signs to indicate that it is now cycle path and that the pedestrians should use the footpath which is a few feet away.... at this point as a pedestrian I can join the cycle network and walk for miles before I would see another sign saying it is no longer shared...
  • Icon 164630 The footpath ends here just before the cycle path drops down to go under the A602... but no signs to indicate where the pedestrians should go to continue their walk?
  • Icon 164629 Here is the end of a footpath leading onto the Cycle Network.. but there is another path on the other side of the bridge.... where are the signs for the pedestrians and cyclists? Is it shared path or not?
  • Icon 164628 This is part of the cycle network however there is a path here that just stops with no signage to indicate what should happen next... so surprise pedestrians use the cycle path to continue their journey.....where are the signs to say this is either cycle path or shared path?

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://tameside.cyclestreets.net/photomap/recent/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.